Scope:- SRC 5No Large Pile Caps.
SRC 2No Large Transfer Slabs. SRC 2No Cores with Bearing
Blocks. High Walls with Buttresses. Suspended Slab over
Walls.
150 New Bond
Street, London
Client:
Skanska
Contract
Value:-2.3m
Scope:- Reinforced Concrete
Frame - 6 Floors + Roof. Suspended slabs from Ground to
Roof. In-Situ stair flights and landings.
4 Piccadilly
Place, Manchester
Client:
Carillion
Contract
Value:-3.5m + 270k Enabling
Package
Scope:- Enabling package
& 8 Floor Reinforced Concrete office block as
part of Machester's Piccadilly Place Development. All
slabs Post Tensioned.
Scope:- 13 Level jump core.
Basement slab, concrete columns, lower ground floor
insitu slab, concrete on tin decking.
Bartholomew Lane, London
Client:
Balfour Beatty
Contract
Value:-2.3m
Scope:- Basement raft
including drainage and crane base. Reinforced Concrete
Frame. Installation of precast stairs. Lower ground
suspended slab. Concrete topping to metal deck.
Barstable
School, Basildon
Client:
Carillion
Contract
Value:-817k
Scope:- Construction of
columns & walls from Ground to L2 + Roof. SRC core
walls & capping slab above roof. Precast stairs.
All rights reserved.
All copyright and other intellectual property rights in all
text, images, sound, software and other materials on this site
are owned by Morrisroe and affiliated companies or are
included with permission of the relevant owner. References to
affiliates or affiliated companies shall include all members
of the Morrisroe Group.