West-Grove-MP2-compressorelephant-park-mp5-9191elephant-park-mp5-8254mp2-23-261116-092-1mp2-23-261116-073-1MP2-270717-052-final-compressorMP2-23-261116-062-compressorMP2-23-261116-044-2-compressorMP2-270717-046-final-compressorelephant-park-mp2-9855elephant-park-mp2-9843MP2-270717-004MP2-270717-018MP2-270717-038MP2-270717-233

Project Description

  • Client: Lendlease
  • Main Contractor: Lendlease
  • Architect: Maccreanor Lavington

Forming part of the Elephant Park Masterplan, Morrisroe has been awarded the contract for the concrete construction of the buildings at plots H02 and H03 within the Elephant Park area itself. Combined, they are known as MP2. Following on from the earlier successful completion of several other constructions within the Elephant Park Masterplan, namely Trafalgar Place, 1 The Elephant and South Gardens (MP1), site work commenced on MP2 during early spring 2016.

The contract for these new homes will include constructions ranging from five storeys up to 31 storeys ‒ the tallest building on the Masterplan, awarded to Morrisroe by Lendlease. The four concrete frame buildings on plot H03 cover an area of 4500m2, with the tallest reaching 31 storeys and the three remaining blocks at ten storeys each. Plot H03 covers an area of 3700m2 and includes one 18 storey tower and three blocks comprising five, seven and ten storeys.

H03 Specifics

  • H03 started in early April 2016 and has a programmed handover date of May 2017
  • Four buildings over an area of 3700m2
  • Block H03C ‒ the 18 storey tower ‒ is being constructed using the DOKA jump form system
  • Ground works, including large pile caps, core cap and crane base excavations up to 4m deep
  • All internal and external drainage works
  • Deep transfer slabs up to 1.2m on level one with soffit heights up to 5.7m

H02 Specifics

  • H02 started in early April 2016 and has a programmed handover date of December 2017
  • Four buildings over an area of 4500m2
  • Block H02C ‒ the 31 storey tower ‒ is being constructed using the DOKA jump form system
  • All other blocks finish at level ten
  • Curved ramp extending from basement to ground floor slab
  • Single-sided walls in basement against secant piles
  • High soffits from ground to level one and podium of up to 5.1m
  • All slabs from level two are post-tensioned and being designed and constructed by Morrisroe